Gable Roof Calculator

Compute gable rafter length, plumb cut, roof area, and sheathing count. Compare Gable vs Hip vs Shed vs Mansard in a multi-dimensional matrix and convert a hip roof to a gable framing plan.

Planning estimates only. Rafter spans, cut angles, sheathing counts, and hip-to-gable conversion steps are typical reference values that vary by species, grade, load region, and locale. Verify every value against the IRC and a licensed structural engineer before construction.

Interactive Gable Roof Calculator: Rafter, Plumb Cut, Sheathing

The gable calculator below takes your building span, pitch, overhang, building length, and rafter depth and returns the run, rise, line rafter length, total rafter (with overhang), plumb cut angle, roof area, sheathing count, ridge board length, and a feasibility check on the chosen rafter depth. Adjust any input and the outputs recompute live.

Inputs

Computed Outputs

Run (span ÷ 2)
12' 0" 3658 mm
Rise (run × pitch/12)
6' 0" 1829 mm
Line rafter length (√run²+rise²)
13' 5" 4089 mm
Total rafter (line + overhang/cos)
14' 6 7/16" 4430 mm
Plumb cut angle (90° − pitch)
63.43°
Pitch angle
26.57°
Roof area (both sides)
1,163 sq ft 108.0 sq m
Sheathing sheets (4×8 = 32 sq ft)
37 +4 with 10% waste
Ridge board length
40' 0"
Common rafter pairs (24 in o.c.)
21
Rafter feasibility (2x8 @ 24" o.c.)
OVERSIZE — step upmax run 11' 9"

Max run guidance assumes SPF #2 at 24 in o.c. under 20 psf live + 10 psf dead load; spans are typical reference values, not prescriptive engineering. For a stamped rafter sizing, see the Rafter Lumber Size Calculator or consult a licensed structural engineer.

Roof TypeTypical Cost ($/sqft)Max Span (ft)Wind ResistanceAttic UsabilityFraming ComplexityMaterial Count
GableRecommended
$2.50–$4.0024–40 ftLowFull attic (triangular)LowFewest rafters (commons + ridge)
Hip
$3.50–$5.5024–40 ftHigh+30% upliftPartial attic (hip ends intrude)High+40% rafters (commons + hips + jacks)
Shed
$1.50–$3.0010–20 ftMediumNo attic (single slope)LowHalf rafters (single slope, no ridge)
MansardHigh Risk
$4.00–$7.0020–30 ftMediumFull upper floor (steep lower slope)HighestMost material (double pitch + dormers)

Headers carry weights/units: cost in $/sqft installed framing, span in ft, wind as uplift index (Gable = 100), attic as % usable volume, complexity as 1.0 = Gable baseline, material as 1.0 = Gable baseline. Recommended = best overall for standard residential; High Risk = cost or scope fatal for budget builds.

Gable vs Hip — Key Metric Ratios

CSS comparison bars; widths are proportional to each metric value (or inverse for cost, where lower is better).

Cost ($/sqft installed framing)Gable $3.25 vs Hip $4.50 (Hip +38%)
Gable
$3.25
Hip
$4.50
Wind uplift resistance (Gable = 100)Gable 100% vs Hip 130% (Hip +30%)
Gable
100%
Hip
130%
Attic usable volume (Gable = 100)Gable 100% vs Hip 60% (Hip -40%)
Gable
100%
Hip
60%

Multi-Dimensional Comparison Matrix: Trade-Off Analysis

The matrix in the hero above is the planning centerpiece of this gable calculator: four roof types (Gable, Hip, Shed, Mansard) scored across six dimensions (cost, span, wind, attic, complexity, material count). Toggle Highlight Differences to flag any cell that deviates more than 25% from the Gable baseline, and use the scenario filter to surface the best fit per use case. The trade-off logic below explains why Gable is Recommended for standard residential and why Mansard is flagged High Risk on cost.

Cost Crossover Point: The 130 mph Wind Threshold

On a calm site (design wind ≤ 110 mph), the Gable wins outright — its $3.25/sqft average beats Hip's $4.50 by $1.25/sqft, which on a 1,800 sqft footprint (40 ft × 45 ft) equals roughly $2,250 in framing savings. But as design wind speed climbs past 130 mph, the Gable needs hurricane straps at every rafter, gable-end bracing, and engineered roof sheathing nailing per IRC R802.11, which adds about $1.20/sqft to the Gable's installed cost. At that 130 mph crossover, Gable's effective $4.45/sqft ≈ Hip's $4.50/sqft. Above 140 mph (Florida HVHZ), Hip is the lower total cost and the ASCE 7 aerodynamic uplift calculation favors the hip form. Below 110 mph, Gable wins by margin; between 110–130 mph the two curves converge; above 140 mph, Hip wins on cost AND structural margin.

Scenario-Based Recommendations

Standard residential (≤ 130 mph wind)

Gable wins: $3.25/sqft avg, Low complexity (1.0× baseline), full attic, 24–40 ft span covers all standard homes. Hip's 30% uplift advantage is wasted cost below 130 mph design wind.

Hurricane / high-wind (≥ 140 mph)

Hip wins: 130% wind uplift index, no flat gable-end sail area, lower hurricane-tie labor. Cost premium is offset by skipped gable-end bracing; ASCE 7 favors the hip form at HVHZ design wind.

Maximum attic volume

Mansard wins (150% attic index = full upper floor) but at 2.6× complexity and 2.0× material count. Gable is the runner-up at 100% — full triangular attic, often enough for storage + mini-dormer.

Tightest framing budget (outbuildings)

Shed wins ($2.25/sqft avg, 0.5× material, 0.6× complexity) but caps at 10–20 ft span. For a full house on a budget, Gable is the cheapest option that still bridges 24–40 ft.

Structural Divergence: Why Hip Resists 30% More Uplift

The 30% uplift advantage of the Hip is a geometry effect, not a material effect. A Gable presents a flat triangular wall at each end that catches wind directly — the leeward gable wall acts as a sail, pressurizing the roof from underneath and peeling sheathing at the ridge. A Hip roof has no flat gable wall; the hip end slopes into the wind on all four faces, so the wind separates cleanly at the eaves and the uplift pressure on the leeward face is roughly 30% lower per ASCE 7 wind-tunnel data. This is why Florida HVHZ insurance carriers charge a measurable premium on Gable roofs that does not apply to Hip roofs of the same span.

Gable Rafter Layout & Cut Marks

A gable rafter is laid out with a framing square set to the run (12 in on the body) and the pitch (e.g., 6 in on the tongue for 6/12). The diagram below shows the geometry: span (full building width), run (half span = horizontal projection of one rafter), rise (vertical), rafter line length (slope distance from ridge plumb to wall plate), ridge (horizontal peak), and the overhang (horizontal extension beyond the wall plate that becomes the eave tail).

RidgeRafterRafterSpan (full building width)RunRunRiseOHOHPlatePlate

Gable roof cross-section: span = full building width, run = span ÷ 2, rise = run × pitch/12, rafter = √(run² + rise²), overhang extends rafter horizontally past the wall plate.

Cut Sequence for a Single Gable Rafter

  1. Plumb cut at the ridge (top): Mark with the framing square tongue on the pitch (6 in for 6/12). Cut at 90° − pitch angle = 63.43° from horizontal at 6/12. This is the angle that seats against the ridge board.
  2. Birdsmouth seat cut at the wall plate: Step the square down the rafter by the run length (e.g., 12 ft for a 24 ft span). Mark a 90° notch — the seat (horizontal cut onto the top plate) is typically 1.5–3 in deep on a 2×8 rafter. The plumb side of the birdsmouth is the same 63.43° angle as the ridge plumb cut.
  3. Tail cut for the eave: Measure the overhang along the rafter top from the birdsmouth plumb line: overhang_along_rafter = overhang_in ÷ cos(pitch angle) = 12 ÷ cos(26.57°) = 13.42 in at 6/12 with a 12 in horizontal overhang. Mark the tail plumb cut at the same 63.43° angle.
  4. Pattern rafter: The first finished rafter becomes the pattern — trace it onto every other board so all 21 pairs (at 24 in o.c. on a 40 ft building) are identical.

Gable vs Hip Structural Differences

The Gable and Hip share the same span range (24–40 ft residential) and the same pitch conventions, so the structural choice is not about whether either can bridge your building — both can — but about three divergent behaviors: wind uplift, attic volume, and framing complexity.

Gable — Two Slopes + Gable Ends

  • 2 roof planes, 1 horizontal ridge, 2 triangular gable-end walls
  • Common rafters + ridge board only — 1.0× material baseline
  • Full triangular attic (100% usable index) under the ridge
  • Flat gable end = sail area for wind uplift (100% baseline)
  • Low complexity (1.0× baseline) — simplest stick frame

Hip — Four Slopes + No Gable Ends

  • 4 roof planes converging on a (shortened) ridge
  • Common + hip + jack rafters — 1.4× material, 1.8× complexity
  • Partial attic (60% usable) — hip ends intrude at every corner
  • Aerodynamic hip ends = 130% wind uplift resistance
  • High complexity (1.8× baseline) — jacks compound cuts at every hip

Non-Linear Behavior at 10× Attic Loading

When attic storage loading scales from 10 psf (light storage) to 20 psf + finished attic, the Gable and Mansard scale linearly — just deepen the rafter one size. The Hip scales non-linearly because the hip rafters carry concentrated load at every corner; doubling live load on a Hip can require doubling the hip rafter depth (e.g., 2×8 → 2×12) and adding a structural hip beam under each end. This is the hidden structural penalty of the Hip form when an attic conversion is the goal — the very feature you want (usable space) is the feature the hip ends deny you. That is why hip-to-gable conversion is a common retrofit when a homeowner wants to finish the attic.

Hip-to-Gable Conversion Guide (Hip to Gable Calculator)

Hip-to-gable conversion is the process of removing a hip roof end and replacing it with a gable end — a common retrofit for attic conversions. The hip to gable calculator logic below takes a 28 ft × 40 ft hip roof at 6/12 with 6 ft hip-end projections on both ends and walks through converting one hip end to a gable.

Hip End (before)Gable End (after)ConvertHip rafters + jacksCommon rafters + gable studsRemove 8 jacks + 2 hip raftersAdd 2 commons + 6–8 studsRidge stops hereRidge extended +6 ft

Hip-to-gable conversion: remove the hip rafter + jack rafters at one end, extend the ridge board, add a gable-end wall and a pair of common rafters.

Walkthrough: 28×40 Hip Roof, 6/12 Pitch, 6 ft Hip Ends

Start with a 28 ft × 40 ft hip roof at 6/12 pitch, with 6 ft hip-end projections on both ends. The existing ridge board is 28 ft long (40 ft building length − 2 × 6 ft hip ends). Converting one hip end to a gable requires:

StepActionPiecesLumber delta
1Strip sheathing off one hip end~6 sheets of 4×8 OSB−$90
2Remove jack rafters (4 per side × 2 sides)8 jacks−$32
3Remove the hip rafter itself2 hip rafters (14.42 ft each)−$48
4Extend ridge board by 6 ft (28 ft → 34 ft for one end)+6 ft of 2×10 ridge+$22
5Install new common rafter pair at the gable end2 commons (14.54 ft each)+$44
6Frame gable-end wall (studs + top plate)~8 studs (2×4) + top/bottom plate+$58
7Re-sheath the new gable end wall + roof plane~6 sheets of 4×8 OSB+$90
NetPer hip end converted—+$44 lumber

Net lumber delta per hip end is roughly +$44 — small. The real costs are labor (~12 hours at $50/hr = $600) and the engineering stamp + permit ($800–$1,500). The gain is roughly 140 sq ft of usable attic floor that was previously triangular dead space under the hip end, valued at ~$70/sqft of finished space = ~$9,800 in added value. Converting both hip ends doubles the lumber and labor, extends the ridge from 28 ft to 40 ft, and adds ~280 sq ft of usable attic.

Structural caveat: a hip-to-gable conversion changes the load path — the new gable end must carry wind uplift that the hip rafter previously distributed to the corner walls. An engineer must design the gable-end bracing (shear wall or let-in brace) and verify the ridge board can span the new ridge length without an intermediate bearing partition. Do not attempt this conversion without a stamped drawing.

Roof Area & Sheathing

The gable calculator computes roof area as 2 × total rafter length × building length. For the default 24 ft × 40 ft building at 6/12 with a 12 in overhang, that is 2 × 14.54 ft × 40 ft = 1,163 sq ft of roof plane area (both slopes). Sheathing sheets = ceil(area ÷ 32) because each 4×8 sheet covers 32 sq ft — so 1,163 ÷ 32 = 36.3 → 37 sheets, plus ~10% waste for cuts and valleys = ~41 sheets. The ridge board length equals the building length (40 ft) since the gable ridge runs the full building.

Pitch Sensitivity on Material Count

Roof area grows with pitch — at 4/12 the same 24×40 building needs only 1,063 sq ft of sheathing (34 sheets); at 8/12 it grows to 1,347 sq ft (43 sheets); at 12/12 it reaches 1,697 sq ft (54 sheets). A steeper pitch buys more attic headroom but costs roughly 16% more sheathing per 2/12 of additional pitch. The calculator above shows the live sheathing count as you change pitch.

Ridge Board Sizing

The ridge board runs the full building length and must be at least as deep as the rafter plumb cut at the ridge. For 2×8 rafters at 6/12, the plumb cut depth is about 7.25 in / cos(26.57°) = 8.1 in, so a 2×8 ridge (7.25 in actual depth) is too short — most crews use a 2×10 ridge (9.25 in) for 2×8 rafters, and a 2×12 ridge for 2×10 rafters. The ridge is non-structural in a stick-framed gable (rafters oppose each other in compression), but it must be supported at each end by a post down to a bearing wall, and at mid-span if the building length exceeds the maximum ridge span (~16 ft without a bearing partition below).

Selection Callouts

💡

Tip: Best selection scenario

Pick Gable when your design wind ≤ 130 mph and you want full attic volume at the lowest framing cost. The 24 ft × 40 ft Gable at 6/12 costs ~$3.25/sqft × 1,163 sqft = ~$3,780 in framing — versus the same Hip at ~$5,235. The $1,455 savings buys your sheathing, underlayment, and shingles outright.

⚠️

Warning: Hidden cost

The Hip's $4.50/sqft framing premium does not include the jack rafter labor. Hip jacks require compound cuts (a plumb cut at the ridge plus a bevel cut against the hip rafter) — figure 2.5× the labor per jack versus a straight gable common. On a 28×40 hip that is 32 jacks × $20/rafter extra = +$640 in labor, pushing the effective hip cost to ~$4.80/sqft before tax.

❌

Don't: Selection taboo

Do not spec a Mansard on a budget build. Mansard framing runs 2.6× complexity (double pitch + dormers), 2.0× material, and the steep lower slope (~72°) means every shingle is a vertical installation that walks off the roof — add ~$1.50/sqft in roofing labor vs a 6/12 gable. The High Risk tag is on cost for a reason; only choose Mansard when the upper-floor square footage is the explicit project goal.

Gable Roof Calculator FAQ

Frequently asked questions on the gable calculator, gable rafter geometry, gable roof rafters, plumb cuts, sheathing, and the hip to gable calculator process.

How does a gable calculator compute the rafter length?

A gable calculator takes the building span and roof pitch, computes the run as span / 2 (since a gable = half span on each side), the rise as run × (pitch / 12), and the rafter line length as √(run² + rise²). On a 24 ft span at 6/12 pitch, the run is 12 ft, the rise is 6 ft, and the rafter line length is √(144 + 36) = √180 = 13.42 ft — about 13 ft 5 in. The gable calculator then adds the overhang extension = overhang_in_inches / cos(pitch angle); a 12 in horizontal overhang at 6/12 pitch adds 12 / cos(26.57°) = 13.42 in = 1.12 ft, for a total rafter of 14 ft 6.5 in from ridge plumb cut to fascia tail.

What is a gable rafter and how is it cut?

A gable rafter is a common rafter that runs from the ridge board down to the doubled top plate of the wall. It carries the slope of the roof on both sides of the ridge and is the most numerous rafter on a gable roof. Each gable rafter gets a plumb cut at the ridge (cut angle measured from vertical = pitch angle; at 6/12 the pitch angle is 26.57°, so the plumb cut is 90° − 26.57° = 63.43° from horizontal) and a birdsmouth seat cut at the wall plate (a 90° notch that seats the rafter on the top plate). The gable rafter pattern is the same on every rafter pair — typically 16 in or 24 in on center along the building length.

How many gable roof rafters do I need for a 24×40 building at 24 in o.c.?

For a 24 ft × 40 ft gable roof at 24 in on center, the rafter count = (40 ft × 12 ÷ 24) + 1 = 21 pairs of common rafters (42 individual rafters), plus a ridge board running the full 40 ft building length. At 16 in o.c. the count rises to (40 × 12 ÷ 16) + 1 = 31 pairs (62 pieces). The gable ends take a single set of gable-end studs plus lookouts, not common rafters — they carry the barge / rake overhang. Use the gable calculator above to recompute for any span, length, or pitch.

How does a hip to gable calculator work?

A hip to gable calculator takes the existing hip roof geometry (span, building length, pitch, hip rafter length, number of jacks per hip end) and outputs the gable-end material needed to replace each hip end: remove the jack rafters (typically 4 per side per hip end = 8 per end) and the 2 hip rafters, add 2 common rafters at the new gable end plus 6–8 gable-end studs, and extend the ridge board by the hip-end projection. For a 28 ft × 40 ft hip roof at 6/12 with 6 ft hip ends on both sides, converting both ends removes ~16 jacks + 4 hip rafters and adds ~4 commons, ~14 studs, and extends the ridge from 28 ft to 40 ft — net +12 ft of ridge board and a rectangular gable end on each side.

How much wind uplift does a hip roof resist vs a gable?

A hip roof resists roughly 30% more wind uplift than a gable of the same span and pitch per ASCE 7 aerodynamic loading models, because the hip end has no flat gable wall to catch wind, so the uplift pressure on the leeward face is lower. In hurricane zones (design wind speed ≥ 140 mph), IRC R802.11 required tie-downs that cost more on a gable (hurricane straps at every rafter, gable-end bracing, engineered sheathing nailing) are reduced — but not eliminated — on a hip. Cost crossover: at sustained design wind ≥ 130 mph, the extra gable bracing cost (~$1.20/sqft) plus base $3.25/sqft equals the hip's flat $4.50/sqft framing premium, so hip becomes the lower total cost above that 130 mph threshold.

What is the plumb cut angle for a 6/12 gable rafter?

The plumb cut angle on a gable rafter = 90° − pitch angle. Pitch angle = arctan(pitch / 12); for 6/12 that is arctan(0.5) = 26.57°. So the plumb cut angle is 90° − 26.57° = 63.43° from horizontal, or 26.57° from vertical. Set your circular saw bevel to 26.57° when cutting the ridge end plumb, and use the same angle on the birdsmouth plumb cut. At 8/12 the plumb cut is 90° − 33.69° = 56.31°; at 12/12 it is 45°. The gable calculator above returns the live plumb cut angle for any pitch.

How much sheathing do I need for a 24×40 gable at 6/12 with 12 in overhang?

Roof area for a gable = 2 × total rafter length × building length. With a 24 ft span, 6/12 pitch, and 12 in horizontal overhang: run = 12 ft, rise = 6 ft, line rafter = 13.42 ft, overhang extension = 12 ÷ cos(26.57°) = 13.42 in = 1.12 ft, so total rafter = 14.54 ft. Roof area = 2 × 14.54 ft × 40 ft = 1,163 sq ft. Sheathing sheets (4×8 = 32 sq ft each) = ceil(1,163 ÷ 32) = 37 sheets. Add 10% waste for cuts and hips valleys = ~41 sheets. Use the gable calculator above to recompute sheathing for any pitch or overhang.

What nominal rafter depth should I use for a 24 ft gable at 6/12?

For a 24 ft gable span at 6/12 pitch at 24 in o.c. under a 20 psf live + 10 psf dead load, a 2×8 SPF #2 covers about 11 ft 9 in of horizontal run — your 12 ft run is just over, so step up to 2×10 (which covers ~13 ft 6 in at the same load) or drop rafter spacing to 16 in o.c. with a 2×8. For a 28 ft span (14 ft run), 2×10 at 24 in o.c. covers the run at 6/12 under most loads; 2×12 lets you push to 32 ft span or 8/12 pitch without changing spacing. The rafter depth selector above flags feasibility live for the current span.

Can I convert a hip roof to a gable, and is it cheaper than building a gable new?

Hip-to-gable conversion is common for attic conversions — you remove the hip end (jacks + hip rafters), extend the ridge board, add a gable end wall with studs and a gable-end common pair, and re-sheath. For a 28×40 hip at 6/12 with 6 ft hip ends, the conversion removes ~16 jacks + 4 hip rafters (~$80 in lumber) and adds ~4 commons + 14 studs + 12 ft of ridge extension + 6 sheets of gable-end wall sheathing (~$210). Net framing delta is roughly +$130 — but the larger gain is ~140 sq ft of usable attic that was previously triangular dead space under the hip ends. The conversion is structural and requires a permit and an engineer's stamped ridge bearing detail.

How do I lay out gable rafter cut marks on a framing square?

Set the framing square with the body on 12 in (run) and the tongue on the pitch number (e.g., 6 in for 6/12). Step the square down the top edge of the rafter stock: every 12 in of body placement = 1 ft of horizontal run. Mark the plumb cut at the top (tongue edge), step the square, mark the birdsmouth plumb and seat cuts, then mark the tail cut with the overhang offset (overhang_in / cos(pitch angle) projected along the rafter top). At 24 in o.c., the rafter pair spacing translates 1:1 to the building length, so a 40 ft building takes 21 pairs spaced 24 in apart — exactly what the gable calculator returns.

What size ridge board do I use for a gable roof?

The ridge board for a gable roof runs the full building length (so 40 ft of building = 40 ft of ridge board). Thickness must be ≥ the rafter plumb cut depth at the ridge (e.g., 2×8 rafters need ≥ 2×8 ridge, but most crews use one size up — 2×10 ridge for 2×8 rafters). The ridge is non-structural in a stick-framed gable (rafters oppose each other in compression), but it must be supported at each end by a post down to a bearing wall or beam, and at mid-span by a post or a structural ridge beam if the span exceeds ~16 ft without a bearing partition below. Use the gable calculator above to verify the ridge length matches your building length.

Does the gable calculator include overhang in the rafter length?

Yes — the gable calculator on this page extends the rafter line length by overhang_in_inches / cos(pitch angle) to give the total rafter length from ridge plumb cut to fascia tail cut. The 12 in default horizontal overhang at 6/12 pitch adds 12 / cos(26.57°) = 13.42 in (1.12 ft) to the 13.42 ft line rafter, giving 14.54 ft total. If your overhang is measured along the slope (rake length) rather than horizontal projection, skip the cosine division and add the rake overhang directly to the line rafter length. The calculator uses horizontal projection, which is the standard framing-square layout convention.

Run the Gable Calculator Above

Enter your building span, pitch, overhang, length, and rafter depth at the top of this page to get live rafter length, plumb cut angle, roof area, sheathing count, and a rafter-depth feasibility flag. Then toggle the comparison matrix to compare Gable vs Hip vs Shed vs Mansard for your scenario.

Browse all calculators

Planning estimates only — verify with local code. Rafter spans, plumb cut angles, sheathing counts, hip-to-gable conversion steps, and the cost crossover point are typical reference values that vary by species, grade, snow load region, design wind speed, and locale. The Gable, Hip, Shed, and Mansard comparison matrix uses typical educative ranges, not prescriptive engineering values. Confirm every value against the IRC (or your local building code), a licensed structural engineer, and a truss / framing manufacturer before ordering materials or starting construction. Never modify a load-bearing roof element without a stamped repair detail.

Related Calculators

🪵

Floor Joist Span Calculator

Interactive floor joist span lookup with reference span char...

📐

Roof Pitch Calculator

Interactive roof pitch calculator: convert X/12 to degrees, ...

🔺

Roof Truss Calculator

Roof truss span estimator and selection guide comparing King...

🪚

Rafter Lumber Size Calculator

Free rafter lumber size calculator for rafters, joists & bea...

🏠

Roofing Calculator

Free roofing calculator to estimate roof materials, pitch, r...

🏔️

Roof Height Calculator

Free roof height calculator: enter span and pitch to get rid...

✂️

Rafter Angle Calculator

Free rafter angle calculator: get plumb cut, seat cut, and b...

⛰️

Roof Ridge Height Calculator

Roof ridge height calculator compares Gable, Hip, and Shed r...

🪜

I-Joist Span Calculator

I-joist span calculator with TJI span tables by series, spac...

💲

Roof Truss Cost Calculator

Roof truss cost calculator estimates truss prices per type. ...

📐

Lean-to Roof Calculator

Lean-to roof calculator finds rafter length, pitch, and slop...

📏

Roof Overhang Calculator

Roof overhang calculator finds eave length, fascia height, a...

🌿

Pergola Rafter Calculator

Pergola rafter calculator finds rafter count, spacing, span,...

🔩

Metal Roof Calculator

Metal roof calculator estimates panel count, panel length, a...

❄️

Rafter Load Calculator

Rafter load calculator converts snow, dead, and live loads i...

🔗

Rafter Tie Calculator

Rafter tie calculator finds horizontal thrust, tie tension, ...

🏚️

Gambrel Rafter Calculator

Gambrel rafter calculator computes upper and lower rafter le...

⛱️

Gazebo Rafter Calculator

Gazebo rafter calculator sizes hip and common rafters for he...

🏗️

Ridge Beam Calculator

Ridge beam calculator compares ridge board vs structural rid...

📋

Rafter Tables

Rafter table calculator: length factors for 1/12 to 24/12 pi...

🧊

Rafter Insulation Calculator

Calculate insulation R-value, batt depth, and vent baffle ga...

🪵

Board Feet Calculator

Board feet calculator with the bd ft = (T×W×L)/12 formula, n...

📐

Linear to Square Feet Calculator

Convert linear feet to square feet and back with material wi...

🪜

Stair Calculator

Stair calculator finds riser height, tread depth, stringer l...

🏢

Flat Roof Rafter Calculator

Flat roof rafter calculator for low-slope roofs: reference 2...

🪟

Dormer Rafter Calculator

Dormer rafter calculator for shed and gable dormers: rafter ...

🏗️

LVL Beam Span Calculator

LVL beam span calculator with reference span charts by depth...

🚪

Header Size Calculator

Size a door or window header with our free calculator. Door ...

🧱

Wall Stud Calculator

Free wall stud calculator and estimator: stud count with ope...